1.5 Dio Unit (DEC102A51)
303
Adaptor
The figure below shows the printed circuit board built in this equipment.
H4P
H12P
3
ON
7
2
6
8
5
1
4
3
2
1
8
4
7
6
5
ON
1
4
2 3
ON
DS6
DS2
DS3
DS4
DS5
Contactor
SS1
Con. Ins.
Group No. Set
DS1 High
0
RS1 Low
D2
CD
D3
D1
D4
CA
A4
M1
A3
CM
A2
A1
M4
M3
M2
F2
F1
N
L
INPUT
H1P H2P
Operation
Monitor
(GRN)
H3P
H10P
4
1
2
H9P
Aiarm
Monitor
(RED)
H11P
3
X1M
X2M
X3M
TNc2
HAP
TNa1
HAP
TNb4
RED
TNc1
TNa3
TNc4
GRN
TNc3
X1A
YE
TNb3
LED10
H10P
TNa4
RED
AC200V
~240V
TNb1
TP1
TNa2
X4M
TNb2
X2A
Terminal block for transmission
(F1/F2) (Terminal size: M3)
Connect this unit to the terminals F1, F2
of the centralized control equipment.
When the transmission is
abnormal, the lamp lights up,
disabling remote control.
(The lamp goes out in the
normal condition.)
The start / stop signal is outputted
to the equipment to be connected.
Abnormal output cutoff / hold
switch (DS5)
This switch makes it possible to select
continuous 1 output or instantaneous 2 output.
Forced stop switch (DS6-4)
Switch for selecting the number
of facility equipment connected
(DS3)
It is possible to select whether
the equipment connection error
is a non-latch or latch error.
Set the switch according to the number
of facility equipment connections.
Shortcircuit during control
quantity setting
Transmission error monitor
(LED10: Red)
DIII-NET Address No. setting
switch (RS1/DS1)
This switch makes it possible to
select whether the system should
be reset to the state before power
failure or not when the power
failure was recovered.
Monitor input switch
(DS6-3)
Output selector switch (SS1)
Start / Stop error switch (DS4-4)
When the microcomputer is in
normal operation, the lamp flickers.
This switch makes it possible to
select whether the operation
output is interrupted or held
when an abnormality occurred
in the connected equipment.
Whether or not the abnormal condition
of facility equipment during stop is
recognized can be selected.
Transmission error switch (DS4-2)
Later push priority switch (DS4-3)
The facility equipment status
is monitored.
Set DIII-NET Address No.
Whether the connected equipment
"error" is detected with contact input
"Open" or "Closed" can be selected.
Terminal block for monitor
input (Terminal size: M3.5)
Terminal block for control
output (Terminal size: M3.5)
This switch makes it possible to
select whether the forced stop
signal should be followed or
neglected.
Switching of whether or not error
detection for start / stop operation
from i-Manager is done is performed.
Start error masks witch
(DS6-1)
This switch makes it possible to
select the absence or presence
of later push priority switch.
Power supply terminal
block (L, N)
For the power supply,
use 1 ~ 200 - 240V.
Quantity change shortcircuit
pin (TP1)
The power transformer
connector is connected.
Momentary stop auto switch (DS4-1)
This switch makes it possible to
select whether the control output
state is maintained or not when
the transmission is abnormal.
Abnormal input detecting switch
(DS2)
Error detecting switch
(DS6-2)
Transformer connecting
connector (CN1/CN2)
Microcomputer OK monitor
(LED-A: Green)
It is possible to select whether
the error at startup is masked
for 10 or 30 seconds.
Содержание D-BACS
Страница 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Страница 17: ...xvi 1 5 Open Network Glossary Introduction ...
Страница 41: ...24 Outline of D BACS System ...
Страница 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Страница 88: ...3 6 Wired Remote Controller with Weekly Schedule Timer BRC1D61 71 Remote Controllers 3P107422 3D ...
Страница 102: ...5 2 Wireless Remote Controller BRC4C 7C 7E 85 Remote Controllers 5 2 Wireless Remote Controller BRC4C 7C 7E ...
Страница 103: ...86 5 3 Simplified Remote Controller BRC2C51 BRC2A51 Remote Controllers 5 3 Simplified Remote Controller BRC2C51 BRC2A51 ...
Страница 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Страница 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Страница 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Страница 215: ...198 3 8 Wiring Example intelligent Manager ...
Страница 235: ...218 Interface for Use in BACnet ...
Страница 249: ...232 7 1 Node Objects Interface for use in LONWORKS 7 Object Details 7 1 Node Objects 7 2 DIII NET Common Objects ...
Страница 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Страница 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Страница 285: ...268 1 6 Notes Power Proportional Distribution P P D ...
Страница 319: ...302 1 5 Dio Unit DEC102A51 Adaptor 1 5 2 Part Names and Functions 1 Appearance Dio Unit DEC102A51 ...
Страница 329: ...312 1 6 Di Unit DEC101A51 Adaptor 1 6 2 Part Names and Functions 1 Appearance Di Unit DEC101A51 ...