
i
Contents
1.
Introduction ................................................................... viii
1-1
DAIKIN Building Air-conditioning Control System
(D-BACS) Overview ........................................................ viii
1-2
Advantages of D-BACS over Automatic Control by
Central System................................................................ viii
1-3
How to Use this Document.................................................x
1-4
Safety Precautions .............................................................x
1-5
Open Network Glossary ....................................................xi
Part 1 Outline of D-BACS System .......................... 1
1.
D-BACS (DAIKIN Building Air Conditioning Control
System) System Over View ............................................. 2
1-1
D-BACS System Integrated System Diagram ................... 2
2.
System Over View ............................................................ 4
2-1
Targeted Project Scale and Map....................................... 4
2-2
Number of Group for Centralized-Control Devices
Connectable with Indoor-Units .......................................... 5
2-3
Control Function of the Devices ........................................ 5
3.
List of D-BACS System Equipment ................................ 6
3-1
List of Control System Equipment ..................................... 6
3-2
Main Specifications and Functions of the Equipment........ 8
4.
List of Control System Equipment and Functions ...... 14
5.
Functions of Centralized Controllers ........................... 15
6.
Central Control Equipment Combinations................... 22
7.
List of Applicable Models of DAIKIN ............................ 23
Part 2 Fundamental of DIII-NET........................... 25
1.
Design of DIII-NET .......................................................... 26
1-1
Features of DIII-NET ....................................................... 26
2.
DIII-NET Design Standard.............................................. 27
2-1
Terminal Number............................................................. 27
2-2
Detail of Outdoor Unit Terminal No. ................................ 27
2-3
Connection Method ......................................................... 28
3.
Wiring Length ................................................................. 34
4.
Unit and Group ............................................................... 35
5.
Number of Connectable Units....................................... 36
5-1
Number of Connectable Units ......................................... 36
5-2
Flow Chart to Determined the Number of Units to
Connected ....................................................................... 37
5-3
Number of Units to be Connected [VRV]
(Supplementary Explanation) .......................................... 38
5-4
Connection of Devices other than VRV ........................... 39
Содержание D-BACS
Страница 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Страница 17: ...xvi 1 5 Open Network Glossary Introduction ...
Страница 41: ...24 Outline of D BACS System ...
Страница 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Страница 88: ...3 6 Wired Remote Controller with Weekly Schedule Timer BRC1D61 71 Remote Controllers 3P107422 3D ...
Страница 102: ...5 2 Wireless Remote Controller BRC4C 7C 7E 85 Remote Controllers 5 2 Wireless Remote Controller BRC4C 7C 7E ...
Страница 103: ...86 5 3 Simplified Remote Controller BRC2C51 BRC2A51 Remote Controllers 5 3 Simplified Remote Controller BRC2C51 BRC2A51 ...
Страница 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Страница 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Страница 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Страница 215: ...198 3 8 Wiring Example intelligent Manager ...
Страница 235: ...218 Interface for Use in BACnet ...
Страница 249: ...232 7 1 Node Objects Interface for use in LONWORKS 7 Object Details 7 1 Node Objects 7 2 DIII NET Common Objects ...
Страница 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Страница 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Страница 285: ...268 1 6 Notes Power Proportional Distribution P P D ...
Страница 319: ...302 1 5 Dio Unit DEC102A51 Adaptor 1 5 2 Part Names and Functions 1 Appearance Dio Unit DEC102A51 ...
Страница 329: ...312 1 6 Di Unit DEC101A51 Adaptor 1 6 2 Part Names and Functions 1 Appearance Di Unit DEC101A51 ...