
196
3.8 Wiring Example
intelligent Manager
3.8.4 intelligent Manager III (DAM602B51) with the Software for ECO Application (DAM003A51)
The UPS is required for transmitting the interruption signal for
the UPS above to the intelligent manager III body.
APC AP9610
Field Supply
The UPS supplies power to the intelligent manager III body,
PC and hub.
APC SU700 or SU1000 Series
Field Supply
UPS
•Performance :
Pentium III:800MHz,Memory:256MB,HDD:4G
•Network:100Base/T Ethernet
•Operation:Keyboard/Mouse,Sound and Speaker
•Software:
Windows XP(Professional SP2 or later)
Windows 2000(Professional SP4 or later)
•CRT:SVGA(800x600,1024x768,1280x1024 )
Field Supply
PC
The hub is required for connecting the intelligent manager III
body and a PC. It is connected to the Line port.
Supporting 100Base/T
Field Supply
HUB
DIII Port: with 4 ports
DAM602B51
DAIKIN
intelligent
Manager III body
Remark
Model/Spec
Arrangement
Equipment
Outdoor Unit
L3 N
L2
L1
A B C F1F2 F1F2 Q1Q2
LAN
(Eth ernet)
PC,Monitor,Sub PC ,Hub
[Field Supply]
Outdoor Unit
L3 N
L2
L1
A B C F1F2 F1F2 Q1Q2
Outdoor Unit
L3 N
L2
L1
A B C F1 F2 F1 F2 Q1 Q2
Outdoor Unit
L3
N
L2
L1
A B C F1 F2 F1 F2 Q1 Q2
Outdoor Unit
L3
N
L2
L1
A B C F1 F2 F1 F2 Q1 Q2
F1 F2 P1 P2
Indoor Unit
Outdoor Unit
L3 N
L2
L1
A B C F1F2 F1F2 Q1Q2
F1 F2 P1 P2
Indoor Unit
R/C
R/C
up to
64×2
groups of
A/Cs and equipment
PC
Sub PC
• 1 pulse to 1W or 1kW pulse width must be within 40-400m/sec.
•Output relay must be electronic type only.
• No voltage output.
Pulse transmitter
Field Supply
kWh meter
Power consumption control software for the outdoor unit
DAM003A51
DAIKIN
ECO
Remark
Model/Spec
Arrangement
Equipment
UPS
[Field Supply]
R/C
F1 F2 P1 P2
Indoor Unit
F1 F2 P1 P2
Indoor Unit
F1 F2 P1 P2
Indoor Unit
up to
64×2
units of
A/Cs and equipment
Power Supply
DIII
Contact Signal
Remote Control
R/C
R/C
R/C
kWh-meters
[Field Supply]
Monitoring for kWh of the following items
• Whole air conditioning systems
[Power
Supply]
3
φ
4W 380-415V 50Hz
[Power Supply]
1
φ
220-240V 50Hz
To each outdoor units
( L1, L2, L3, N )
256 groups
Connectable
When using Power
Limit Control, kWh-
meter is necessary.
1G2
3G4
5G
6
7G
8
9
G
10 11 G
12
13
G
14
15
G
16
Содержание D-BACS
Страница 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Страница 17: ...xvi 1 5 Open Network Glossary Introduction ...
Страница 41: ...24 Outline of D BACS System ...
Страница 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Страница 88: ...3 6 Wired Remote Controller with Weekly Schedule Timer BRC1D61 71 Remote Controllers 3P107422 3D ...
Страница 102: ...5 2 Wireless Remote Controller BRC4C 7C 7E 85 Remote Controllers 5 2 Wireless Remote Controller BRC4C 7C 7E ...
Страница 103: ...86 5 3 Simplified Remote Controller BRC2C51 BRC2A51 Remote Controllers 5 3 Simplified Remote Controller BRC2C51 BRC2A51 ...
Страница 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Страница 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Страница 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Страница 215: ...198 3 8 Wiring Example intelligent Manager ...
Страница 235: ...218 Interface for Use in BACnet ...
Страница 249: ...232 7 1 Node Objects Interface for use in LONWORKS 7 Object Details 7 1 Node Objects 7 2 DIII NET Common Objects ...
Страница 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Страница 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Страница 285: ...268 1 6 Notes Power Proportional Distribution P P D ...
Страница 319: ...302 1 5 Dio Unit DEC102A51 Adaptor 1 5 2 Part Names and Functions 1 Appearance Dio Unit DEC102A51 ...
Страница 329: ...312 1 6 Di Unit DEC101A51 Adaptor 1 6 2 Part Names and Functions 1 Appearance Di Unit DEC101A51 ...