iv
2.
<DCS301BA61> Unified ON/OFF Controller .............. 150
2-1
Function......................................................................... 150
2-2
System Configuration .................................................... 150
2-3
Specification and Dimension ......................................... 151
2-4
Part names and Functions ............................................ 151
2-5
Initial Setting.................................................................. 153
2-6
Electric Wiring ............................................................... 155
2-7
Confirming Operation .................................................... 155
2-8
Installation ..................................................................... 156
3.
<DST301BA61> Schedule Timer ................................. 157
3-1
Function......................................................................... 157
3-2
System Configuration .................................................... 157
3-3
Specification and Dimension ......................................... 158
3-4
Part names and Functions (DST301BA61) ................... 159
3-5
Initial Setting.................................................................. 161
3-6
Electric Wiring ............................................................... 162
3-7
Installation ..................................................................... 163
3-8
Error Diagnosing Function............................................. 163
Part 6 intelligent Manager ................................. 165
1.
intelligent Manager Overview...................................... 166
1-1
Features ........................................................................ 166
1-2
Specification .................................................................. 176
1-3
Functions....................................................................... 177
2.
System Design of intelligent Manager ....................... 178
2-1
System Configuration of intelligent Manager................. 178
2-2
List of Required Devices for
intelligent Manager System ........................................... 178
2-3
Creation of DIII-NET Wiring Diagram ............................ 179
2-4
Allocation of Centralized Address ................................. 181
2-5
Points to Note for Design .............................................. 182
2-6
Use with Other Centralized Devices.............................. 183
3.
Installation and Electric Wiring................................... 184
3-1
Components .................................................................. 184
3-2
Part Name and Function ............................................... 184
3-3
Installation ..................................................................... 186
3-4
“DIII-NET master” setting .............................................. 187
3-5
System Wiring ............................................................... 188
3-6
Electric Wiring Connection ............................................ 189
3-7
Setting group No. for centralized control ....................... 192
3-8
Wiring Example ............................................................. 193
Part 7 Interface for Use in BACnet
®
.................. 199
1.
BACnet
®
Interface ........................................................ 200
1-1
Outline and Features..................................................... 200
1-2
System Outline .............................................................. 200
1-3
System Configuration .................................................... 201
1-4
Specifications ................................................................ 202
Содержание D-BACS
Страница 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Страница 17: ...xvi 1 5 Open Network Glossary Introduction ...
Страница 41: ...24 Outline of D BACS System ...
Страница 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Страница 88: ...3 6 Wired Remote Controller with Weekly Schedule Timer BRC1D61 71 Remote Controllers 3P107422 3D ...
Страница 102: ...5 2 Wireless Remote Controller BRC4C 7C 7E 85 Remote Controllers 5 2 Wireless Remote Controller BRC4C 7C 7E ...
Страница 103: ...86 5 3 Simplified Remote Controller BRC2C51 BRC2A51 Remote Controllers 5 3 Simplified Remote Controller BRC2C51 BRC2A51 ...
Страница 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Страница 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Страница 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Страница 215: ...198 3 8 Wiring Example intelligent Manager ...
Страница 235: ...218 Interface for Use in BACnet ...
Страница 249: ...232 7 1 Node Objects Interface for use in LONWORKS 7 Object Details 7 1 Node Objects 7 2 DIII NET Common Objects ...
Страница 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Страница 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Страница 285: ...268 1 6 Notes Power Proportional Distribution P P D ...
Страница 319: ...302 1 5 Dio Unit DEC102A51 Adaptor 1 5 2 Part Names and Functions 1 Appearance Dio Unit DEC102A51 ...
Страница 329: ...312 1 6 Di Unit DEC101A51 Adaptor 1 6 2 Part Names and Functions 1 Appearance Di Unit DEC101A51 ...