2.6 Electric Wiring
155
Control Devices
2.6
Electric Wiring
All wiring, components and materials to be procured on the site must comply with the applicable local and national
codes.
Use copper conductors only.
All field wiring and components must be provided by licensed electrician.
Unit shall be grounded in compliance with the applicable local and national codes.
Fit the power supply wiring with a fuse and a switch.
After wiring work, check power to the equipment shuts OFF when switch is shut OFF.
Wiring Specification
Notes:
1. The size of power supply wiring must comply with the applicable national and local codes.
Connect the wiring between indoor and outdoor units, indoor/outdoor units and power supply, and indoor units and
remote controllers.
For details, refer to the installation manuals of indoor and outdoor units.
2.7
Confirming Operation
Before starting test operation, supply power to the indoor units, outdoor units, and unified ON/OFF controller and press
the ON/OFF button. If the operation lamp flashes, it indicates a malfunction in the indoor unit of the applicable group.
If the display of “
” flashes, it indicates a malfunction in the optional controllers for centralized control. Check for
such malfunctions.
Notes:
For test operation of indoor and outdoor units, refer to the installation manual attached with the outdoor unit.
After turning the power supply ON, if the unit does not accept operation for two minutes or more with the display of
“
” flashing, check the following points.
Check that setting of the connector for setting master controller is correct.
Check that the group No. for centralized control has been set.
1P162827
General Instructions
Wiring Outline
Type
Size
Power Supply Wiring
H05VV-U3G
(Note 1)
Max. 16 groups
Power supply
~
100-240V 50/60Hz
Unified ON/OFF controller
Electric parts
box
(KJB212AA)
Fuse
(15A)
Switch
F1,F2
F1,F2
F1,F2
F1,F2
F1,F2
F1,F2
L
N
Outdoor
unit
Содержание D-BACS
Страница 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Страница 17: ...xvi 1 5 Open Network Glossary Introduction ...
Страница 41: ...24 Outline of D BACS System ...
Страница 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Страница 88: ...3 6 Wired Remote Controller with Weekly Schedule Timer BRC1D61 71 Remote Controllers 3P107422 3D ...
Страница 102: ...5 2 Wireless Remote Controller BRC4C 7C 7E 85 Remote Controllers 5 2 Wireless Remote Controller BRC4C 7C 7E ...
Страница 103: ...86 5 3 Simplified Remote Controller BRC2C51 BRC2A51 Remote Controllers 5 3 Simplified Remote Controller BRC2C51 BRC2A51 ...
Страница 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Страница 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Страница 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Страница 215: ...198 3 8 Wiring Example intelligent Manager ...
Страница 235: ...218 Interface for Use in BACnet ...
Страница 249: ...232 7 1 Node Objects Interface for use in LONWORKS 7 Object Details 7 1 Node Objects 7 2 DIII NET Common Objects ...
Страница 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Страница 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Страница 285: ...268 1 6 Notes Power Proportional Distribution P P D ...
Страница 319: ...302 1 5 Dio Unit DEC102A51 Adaptor 1 5 2 Part Names and Functions 1 Appearance Dio Unit DEC102A51 ...
Страница 329: ...312 1 6 Di Unit DEC101A51 Adaptor 1 6 2 Part Names and Functions 1 Appearance Di Unit DEC101A51 ...