256
1.1 System Architecture
Power Proportional Distribution (P.P.D.)
1. P.P.D. Design Guide
1.1
System Architecture
1.1.1 Confirmation of Watthour Meter
For distribution of electric energy, the integrating watthour meter with pulse transmitter is required.
It is important to confirm that the specifications coincide with each other, and also to confirm with the division in charge
(normally, electrical work division, not air-conditioning div.).
· Specifications of watthour meter to be connected to intelligent Manager
a) To be an integrating watthour meter with pulse transmitter.
b) The output pulse unit (pulse weight) is to be 1 pulse to 1kWh (1kWh/pulse).
c) The pulse width is to be within 40 to 400 milli-sec.
d) The electronic type relay is to be used for pulse output, and it to be no-voltage output.
If the specifications are not coincident, there is a possibility that the following imperfections are caused:
If the output pulse unit is not 1kWh/pulse.
It results a large difference between the reading (value) of watthour meter and the total value of distribution of electric
energy.
For the charge calculation, the number of pulse input is counted and the power consumption of the outdoor unit is
monitored, therefore, for example, if the large value, 10kWh/pulse, is inputted, the electric energy calculated is the
value of one tenth (1/10) times.
If the pulse width is not within 40 to 400 milli-sec.
If it is less than 40 milli-sec., the pulse input cannot be detected, and the result of calculation is smaller than the real
value.
In addition, if more than 400 milli-sec., more than 2 pulses is detected for 1-pulse input, and the result of calculation is
larger than the real value.
If use of contact other than electronic type relay.
If it is a general relay, the pulse may not accurately be detected due to relay chattering.
Confirm the following items for the construction process.
Construction of pulse signal line is kept away from power cables
For this pulse signal line, the voltage DC24V should be applied from the intelligent Manager side. It should be
constructed separating from the power cables.
Max. distance to be 200 m
Confirm that the distance with the watthour meter~intelligent Manager is within 200 m.
Содержание D-BACS
Страница 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Страница 17: ...xvi 1 5 Open Network Glossary Introduction ...
Страница 41: ...24 Outline of D BACS System ...
Страница 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Страница 88: ...3 6 Wired Remote Controller with Weekly Schedule Timer BRC1D61 71 Remote Controllers 3P107422 3D ...
Страница 102: ...5 2 Wireless Remote Controller BRC4C 7C 7E 85 Remote Controllers 5 2 Wireless Remote Controller BRC4C 7C 7E ...
Страница 103: ...86 5 3 Simplified Remote Controller BRC2C51 BRC2A51 Remote Controllers 5 3 Simplified Remote Controller BRC2C51 BRC2A51 ...
Страница 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Страница 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Страница 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Страница 215: ...198 3 8 Wiring Example intelligent Manager ...
Страница 235: ...218 Interface for Use in BACnet ...
Страница 249: ...232 7 1 Node Objects Interface for use in LONWORKS 7 Object Details 7 1 Node Objects 7 2 DIII NET Common Objects ...
Страница 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Страница 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Страница 285: ...268 1 6 Notes Power Proportional Distribution P P D ...
Страница 319: ...302 1 5 Dio Unit DEC102A51 Adaptor 1 5 2 Part Names and Functions 1 Appearance Dio Unit DEC102A51 ...
Страница 329: ...312 1 6 Di Unit DEC101A51 Adaptor 1 6 2 Part Names and Functions 1 Appearance Di Unit DEC101A51 ...