
4
4
4-114
4-114
Parts Replacement and Cleaning > Image Formation System > Reinstalling the Process Unit > Procedure
Parts Replacement and Cleaning > Image Formation System > Reinstalling the Process Unit > Procedure
4) Slowly take the Process Unit back to the host machine and fix it with 2 screws.
x2
CAUTION:
After closing the Process Unit, hold the edge of each Drum Unit from above as
described below. If the Drum Unit is not secured, it may cause the color displacement.
F-4-177
F-4-176
5) Turn the ITB Pressure Release Lever in the left direction to apply the pressure.
CAUTION:
When applying the pressure of ITB Pressure Release Lever, make sure that the
protrusion of grip is aligned with the lower triangle mark of plate.
6) Install the ITB Cover and tighten the 2 loosened screws.
7) Close the Front Cover.
8) Close the Right Upper Cover.
9) Close the Right Lower Cover.
F-4-178
F-4-179
Содержание IMAGERUNNER ADVANCE C5030
Страница 17: ...1 1 Product Overvew Product Overvew Product Lineup Feature Specification Name of Parts Operation ...
Страница 259: ...3 3 Periodical Service Periodical Service Consumable Parts Replacement Parts and Cleaning Parts ...
Страница 450: ...5 5 Adjustment Adjustment Main Controller Image Formation System Pickup Feed System ...
Страница 575: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code ...
Страница 701: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD ...