
9
9
9-55
9-55
Installation■>■Cassette■Heater■Unit■>■Checking■After■the■Installation
Installation■>■Cassette■Heater■Unit■>■Checking■After■the■Installation
Checking■After■the■Installation
Caution:
When■removing■the■cover,■be■
sure■not■to■insert■a■screwdriver■in■
the■elongate■hole.
1)■Remove■the■Environment■Heater■Switch■Cover.
F-9-102
2)■Check■that■the■Environment■Heater■Switch■is■ON.
3)■Turn■ON,■if■it■was■OFF.
F-9-103
4)■nstall■the■Environment■
Heater■Switch■Cover.
5)■Check■that■the■breaker■switch■in■the■back■of■the■main■unit■is■ON.
6)■Turn■ON,■if■it■was■OFF.
F-9-104
7)■Connect■the■power■plug■of■the■
host■machine■to■the■power■outlet.
Содержание IMAGERUNNER ADVANCE C5030
Страница 17: ...1 1 Product Overvew Product Overvew Product Lineup Feature Specification Name of Parts Operation ...
Страница 259: ...3 3 Periodical Service Periodical Service Consumable Parts Replacement Parts and Cleaning Parts ...
Страница 450: ...5 5 Adjustment Adjustment Main Controller Image Formation System Pickup Feed System ...
Страница 575: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code ...
Страница 701: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD ...