
User Guide
250
www.bull.com
■
Flashing switching back and forth between green and amber
The lamp indicates that reconstruction (rebuild) processing is being performed for
the hard disk. (This flashing does not indicate a failure.) When a failing hard disk
is replaced in a RAID system, the system rebuilds the data. (Auto-rebuild function)
The lamp switches back and forth between green and amber during rebuild
processing.
The lamp goes off when the rebuild processing finishes.
It turns amber when the rebuild processing fails.
Caution
If the server is turned off during rebuild processing, the process-
ing is stopped. Restart the server, mount the new hard disk in
hot swap mode, and then perform rebuild processing again.
Observe the following notes on using the auto-rebuild function.
■
Do not turn the power off. (Once the power is turned off, the
auto-build function does not start.)
■
Let 90 seconds or more pass between when dismounting a
failing hard disk and when mounting the new one.
■
Do not replace a failing hard disk while rebuild processing is
being performed for another hard disk.
Содержание NovaScale R440 E1
Страница 1: ...NovaScale R440 E1 User s Guide NOVASCALE REFERENCE 86 A1 83EV 00...
Страница 2: ......
Страница 54: ...User Guide 53 www bull com K Keyboard L Mouse 1 100BASE T 1000BASE TX 10BASE T 2 100BASE T 1000BASE TX 10BASE T...
Страница 69: ...User Guide 68 www bull com Note The BIOS may display more options that presented here...
Страница 315: ...User Guide 314 www bull com 3 Follow the on screen messages to proceed with the activation...
Страница 365: ......
Страница 366: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 83EV 00...