Preparing Your Server for Upgrade
To prepare your server for installation or removal
1.
Observe the safety and static precautions listed under “General Information”
and “Static Precautions” at the beginning of this chapter.
2.
Shutdown the operating system (OS).
It is not necessary to shutdown to replace hot-swappable components, such as
the hard disk drives and the additional power supply units, if applicable.
3.
Unlock and remove the front bezel. (
See “Removing the Front Bezel” on
A - Unlocked B - Locked
Figure 95: Unlocking and removing the Front Bezel
4.
Power off the server then press the POWER switch on the front panel of the
server.
The POWER lamp goes out.
5.
Unplug the server power cord(s) from the AC wall outlet(s).
Note: If the server power cord is connected to a power
control unit such as an UPS (Uninterruptible Power Supply),
refer to the UPS user's guide for proper power-off procedures.
6.
Unplug the I/O cables connected to the rear panel of your server.
The server needs to be pulled out from the rack for installing/removing any internal
components other than the hard disk drives and power supply units (redundant power
supply model only).
A
B
1
2
Содержание NovaScale R440 E1
Страница 1: ...NovaScale R440 E1 User s Guide NOVASCALE REFERENCE 86 A1 83EV 00...
Страница 2: ......
Страница 54: ...User Guide 53 www bull com K Keyboard L Mouse 1 100BASE T 1000BASE TX 10BASE T 2 100BASE T 1000BASE TX 10BASE T...
Страница 69: ...User Guide 68 www bull com Note The BIOS may display more options that presented here...
Страница 315: ...User Guide 314 www bull com 3 Follow the on screen messages to proceed with the activation...
Страница 365: ......
Страница 366: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 83EV 00...