5-42
Section 5: Adjustments
Section Rev. February 2017
SWEEP WAGON ROLLER ADJUSTMENT
The sweep wagon rides on guide rollers that travel in two guide rails on the pinsetter frame. The
horizontal rollers must be adjusted so the mounting bolts of the vertical rollers have a minimum
clearance of 5 mm from the inside wall of the side frame and each vertical roller is fully resting on the
rails. To adjust, loosen the mounting hardware for the horizontal guide rollers and position the sweep
side to side. Refer to
Figure 5-51.
i
NOTE:
Check the sweep wagon in the forward and rearward position for clearance.
Figure 5-50. Sweep Attenuator/Switch “G” Adjustment.
(1) SWITCH “G”
(2) FRONT MOUNTING PLATE (3) STOP SCREW
(4) HEX NUTS
(5) SWEEP ATTENUATOR
(6) PLUNGER FREE PLAY WITH
SWITCH
CLOSED
2. Adjust the “G” switch with the attenuator down. The switch’s plunger must have free play with
the switch closed. Refer to
Figure 5-50.
i
NOTE:
If free play in the plunger cannot be attained by moving the switch, increase the 85 mm
dimension 1 mm at a time until there is free play with the switch closed.
Содержание GS-X Series
Страница 1: ...Operations Service Manual GS X Pinsetter with Advanced CE Guarding March 2017 47 902748 000...
Страница 4: ...2 Safety Section Section Rev February 2017 Intentionally Blank Page...
Страница 15: ...Section Rev February 2017 Safety Section 13 GS Safetty Mirror Safety Mirror...
Страница 36: ...1 2 Section 1 Operations Section Rev February 2009 Intentionally Blank Page...
Страница 51: ...Section Rev February 2009 Section 1 Operations 1 17 Figure 1 14 Setting New Pins...
Страница 68: ...2 2 Section 2 Electronics Switches Solenoids and Motors Section Rev December 2016 Intentionally Blank Page...
Страница 94: ...3 2 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Страница 125: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 33 Safety Controller Codes Version I And II Table 5...
Страница 131: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 39 Intentionally Blank...
Страница 134: ...3 42 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Страница 136: ...3 44 Section 3 Nexgen Electronics Section Rev February 2017 Back of 11 x 17 Here...
Страница 150: ...3 58 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Страница 152: ...4 2 Section 4 Pinsetter Cycles Section Rev February 2009 Intentionally Blank Page...
Страница 158: ...4 8 Section 4 Pinsetter Cycles Section Rev February 2009 Figure 4 5 Pinsetter Cycles...
Страница 176: ...5 2 Section 5 Adjustments Section Rev February 2017 Intentionally Blank Page...
Страница 226: ...6 2 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank Page...
Страница 246: ...6 22 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank...
Страница 257: ...Section Rev February 2009 Section 7 Preventative Maintenance 7 11...
Страница 284: ...7 38 Section 7 Preventative Maintenance Section Rev February 2009...
Страница 286: ...8 2 Section 8 Servicing Section Rev February 2009 Intentionally Blank Page...