8-6
Section 8: Servicing
Section Rev. February 2009
CLEARING PINS JAMMED IN DISTRIBUTOR
1. Turn the stop/run on the rear mechanic’s box , Nexgen box, or mechanic’s remote display to the
stop position. If possible, turn off the main power switch on the Nexgen Controller box and
remove the incoming 3 phase power.
2. Check for pins jammed at track ejector points. Check for pins jammed at belt turning points.
Remove the jammed pins and place them on the outside return belt track.
3. Check the pin ejector assemblies for proper positions.
4. Continuous jams require checking the pin station assemblies for broken parts. Check pin
release levers.
5. Apply power to the pinsetter.
6. Check pinsetter operation.
STOPPING MACHINE IN MID-CYCLE
A machine may be stopped in mid-cycle by turning the stop/run switch on the Nexgen Controller,
mechanic’s remote display, or mechanic’s box to the stop position. Once power is restored to the
pinsetter it will automatically return to home or ready to bowl position.
If internal service work is to be performed, turn off the main power switch and if possible, disconnect
the incoming 3 phase power. Use an approved lockout device on the main power switch to prohibit the
machine from being turned on.
NOTE:
Removing the incoming 3 phase power will disable both pinsetters. Upon completion
of work, reconnect the 3 phase power, remove any installed lockout devices and turn the main
power switch on.
Once the machine has initialized, turn the stop/run switches to the run position. With older versions of
GS firmware the machine will return to the “ready to bowl” position. With newer firmware a power fail
(PF) error may be displayed. Clear the code by toggling both stop/run switches off then on.
Содержание GS-X Series
Страница 1: ...Operations Service Manual GS X Pinsetter with Advanced CE Guarding March 2017 47 902748 000...
Страница 4: ...2 Safety Section Section Rev February 2017 Intentionally Blank Page...
Страница 15: ...Section Rev February 2017 Safety Section 13 GS Safetty Mirror Safety Mirror...
Страница 36: ...1 2 Section 1 Operations Section Rev February 2009 Intentionally Blank Page...
Страница 51: ...Section Rev February 2009 Section 1 Operations 1 17 Figure 1 14 Setting New Pins...
Страница 68: ...2 2 Section 2 Electronics Switches Solenoids and Motors Section Rev December 2016 Intentionally Blank Page...
Страница 94: ...3 2 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Страница 125: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 33 Safety Controller Codes Version I And II Table 5...
Страница 131: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 39 Intentionally Blank...
Страница 134: ...3 42 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Страница 136: ...3 44 Section 3 Nexgen Electronics Section Rev February 2017 Back of 11 x 17 Here...
Страница 150: ...3 58 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Страница 152: ...4 2 Section 4 Pinsetter Cycles Section Rev February 2009 Intentionally Blank Page...
Страница 158: ...4 8 Section 4 Pinsetter Cycles Section Rev February 2009 Figure 4 5 Pinsetter Cycles...
Страница 176: ...5 2 Section 5 Adjustments Section Rev February 2017 Intentionally Blank Page...
Страница 226: ...6 2 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank Page...
Страница 246: ...6 22 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank...
Страница 257: ...Section Rev February 2009 Section 7 Preventative Maintenance 7 11...
Страница 284: ...7 38 Section 7 Preventative Maintenance Section Rev February 2009...
Страница 286: ...8 2 Section 8 Servicing Section Rev February 2009 Intentionally Blank Page...