Section Rev. February 2017
Safety Section
29
REMOVING PIN(S) FROM UNDER THE SWEEP
Suggested Work Location: Work Area 4
CAUTION: Removing a pin from under the sweep places the mechanic
between the bowler and the machine. Always make sure that a bowler is not
positioned to throw a ball before putting yourself between the bowler and the
machine. It is good practices to have another employee positioned near any
bowler to ensure they cannot throw a ball and/or place a sign on the approach
to indicate the lane is not available for bowling.
CAUTION: When accessing the machine for work area 4, the main power
switch on the Nexgen or Safety Controller must be locked into the off position
using a suitable locking mechanism.
1. Turn the stop/run on the mechanic’s remote display or the Nexgen box to the stop position.
Turn off the main power switch on the Power Safety Controller box and lock the switch into the
off position using an approved lockout device.
2. Verify that all bowlers on the lane pair are off the approach and are not in a position to throw a
ball.
3. Manually pivot the sweep board upward and remove the pin(s) from under the sweep.
4. Restart the safety controller restore power to the pinsetter:
If the Green “Restart Photocell” LED is “On” press the photo sensor restart button to illuminate
the yellow “Ready for Restart” LED, then press the restart button. If only the yellow “Ready
for Restart” LED is “On” press the restart button.
5. Once the machine has initialized, toggle the stop/run switches on the mechanic’s remote display
to clear the power failure (PF) codes.
6. Check pinsetter operation.
Содержание GS-X Series
Страница 1: ...Operations Service Manual GS X Pinsetter with Advanced CE Guarding March 2017 47 902748 000...
Страница 4: ...2 Safety Section Section Rev February 2017 Intentionally Blank Page...
Страница 15: ...Section Rev February 2017 Safety Section 13 GS Safetty Mirror Safety Mirror...
Страница 36: ...1 2 Section 1 Operations Section Rev February 2009 Intentionally Blank Page...
Страница 51: ...Section Rev February 2009 Section 1 Operations 1 17 Figure 1 14 Setting New Pins...
Страница 68: ...2 2 Section 2 Electronics Switches Solenoids and Motors Section Rev December 2016 Intentionally Blank Page...
Страница 94: ...3 2 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Страница 125: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 33 Safety Controller Codes Version I And II Table 5...
Страница 131: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 39 Intentionally Blank...
Страница 134: ...3 42 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Страница 136: ...3 44 Section 3 Nexgen Electronics Section Rev February 2017 Back of 11 x 17 Here...
Страница 150: ...3 58 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Страница 152: ...4 2 Section 4 Pinsetter Cycles Section Rev February 2009 Intentionally Blank Page...
Страница 158: ...4 8 Section 4 Pinsetter Cycles Section Rev February 2009 Figure 4 5 Pinsetter Cycles...
Страница 176: ...5 2 Section 5 Adjustments Section Rev February 2017 Intentionally Blank Page...
Страница 226: ...6 2 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank Page...
Страница 246: ...6 22 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank...
Страница 257: ...Section Rev February 2009 Section 7 Preventative Maintenance 7 11...
Страница 284: ...7 38 Section 7 Preventative Maintenance Section Rev February 2009...
Страница 286: ...8 2 Section 8 Servicing Section Rev February 2009 Intentionally Blank Page...