
Distillation Process Analyzer DPA-4.5
Commissioning
7.3 Switching on the power supply
Preparation
•
Check all safety equipment. You can find information in this
regard in the Maintenance chapter on page 129.
•
Check connections for leaks.
•
Make sure that the pressure and flow of the instrument air are
set correctly.
•
Check that all electrical terminals are firmly seated.
Switching on
•
Switch on the power supply with the main switch.
The control box is purged with instrument air. This results in
considerable noises emissions. The pressure monitor displays
the remaining rinsing time.
During the purging phase, all electrical operating equipment
without its own ignition protection is voltage-free. The device is
not ready for operation.
After the purging phase, the control computer starts and the
touchscreen is ready for use shortly afterwards. The optionally
available chiller and trace heaters are switched on.
The operating system, the PACS process software and other
applications start.
In normal operation the device starts measuring automatically
with the configuration and operating mode last set.
106
December 2013