Figure 13: Typical terminal board (three 4-20mA inputs option)
2.5.2 Cable tie-down posts
There are two cable tie-down posts provided in the
Sentinel
LCT8
transmitter (see
Figure 14
below). These posts enable
the user to insert a cable tie through them, and secure the
wiring coming into or out of the instrument. The posts rotate
on the printed circuit board to provide ease-of-use.
•
Power cable tie-down post
- use this tie-down post to
secure the power cable.
•
Optional I/O cable tie-down post
- use this tie-down post
to secure all I/O cables.
Power cable
tie-down post
Optional I/O cable
tie-down post
Figure 14: Cable tie-down posts locations
2.5.3 Wiring the line power
The
Sentinel LCT8
may be ordered for operation with a
power input of either 100-240 VAC or 12–32 VDC. The label on
the side of the electronics enclosure lists the required line
voltage and power rating for your unit. Be sure to connect
the
Sentinel LCT8
to the specified line voltage only.
NOTE:
For compliance with the North American and
European low voltage directive, this unit requires an external
power disconnect device such as a switch or circuit breaker.
The disconnect device must be marked as such, clearly
visible, directly accessible, and located within 1.8 m (6 ft)
of the unit.
NOTE:
Use one conduit inlet for the power cable, and use the
two remaining conduit inlets for any I/O cables as needed.
All unused conduit inlets should be sealed with suitable
blank plugs (see
Figure 15
below).
Figure 15: Conduit inlet ports
See
or
locate terminal block TB1 and to connect the line power
as follows:
WARNING!
Improper connection of the line power
leads, or connecting a
Sentinel LCT8
to the
incorrect line voltage, may damage the unit.
It may also result in hazardous voltages at
the meter body and associated piping as
well as within the electronics enclosure.
1. Prepare the line power leads by trimming the line and
neutral AC power leads (or the positive and negative DC
power leads) to a length 0.5 in. (1 cm) shorter than the
ground lead. This ensures that the ground lead is the
last to detach if the power cable is forcibly disconnected
from the meter.
2. Route the cable through one of three conduit inlet ports
(see Figure 15 above) and connect the line power leads
to terminal block
TB1
, using the pin number assignments
shown in
or
Attention European customers!
To meet CE Mark requirements, all cables
must be installed as described in
A . CE Mark compliance and high noise
10
10
Содержание Panametrics Sentinel LCT8
Страница 1: ...Sentinel LCT8 User s manual...
Страница 2: ...ii...
Страница 4: ...no content intended for this page proceed to next page iv...
Страница 29: ...Figure 32 Wiring LCT8 to SEN898 electronics cross plane 6 24 flowcell local mount ref dwg 702 2041 19...
Страница 30: ...20...
Страница 98: ...88...
Страница 122: ...no content intended for this page 112...
Страница 132: ...122...