Chapter 2. Installation
2.1 Installation guidelines
This section provides general information with respect
to the mechanical and electrical installation, and should
be thoroughly reviewed before the system is installed. To
ensure safe and reliable operation of the
Sentinel LCT8
, the
system must be installed in accordance with the guidelines
established by Panametrics, as explained in this chapter.
WARNING!
The
Sentinel LCT8
flow measurement system
can measure the flow rate of many fluids,
some of which are potentially hazardous.
Strict observance of proper safety practices
is essential.
WARNING!
Be sure to follow all applicable local safety
codes and regulations for installing electrical
equipment and working with hazardous
gases or flow conditions. Consult company
safety personnel or local safety authorities to
verify the safety of any procedure or practice.
Attention European customers!
To meet CE Mark requirements, all cables
must be installed as described in
A . CE Mark compliance and high noise
.
Attention European customers!
This manual fulfills the requirements of
the Pressure Equipment Directive 97/23/EC.
Please read it carefully in order to guarantee
safe operation of this pressure equipment.
Follow all warnings and instructions marked
on the product.
2.2 Bill of materials
The following items should have been included in the
shipment:
•
Sentinel LCT8
flow meter
• Magnetic wand
• User’s manual
• CD with PanaView SEN898 software (optional)
5
Содержание Panametrics Sentinel LCT8
Страница 1: ...Sentinel LCT8 User s manual...
Страница 2: ...ii...
Страница 4: ...no content intended for this page proceed to next page iv...
Страница 29: ...Figure 32 Wiring LCT8 to SEN898 electronics cross plane 6 24 flowcell local mount ref dwg 702 2041 19...
Страница 30: ...20...
Страница 98: ...88...
Страница 122: ...no content intended for this page 112...
Страница 132: ...122...