Lo
ad
T
ap
C
ha
ng
er
raise,lower
signals/alarms
position
BOM
MIM
IED
I
L1
,I
L2
,I
L3
TRM
3ph or ph-ph or 1ph Current
High Voltage Side
(Load Current) I
L
Low Voltage Side
Line Impedance R+jX
U
B
(Busbar Voltage)
Load Center
UL (Load Point Voltage)
IEC10000044-2-en.vsd
BIM
3ph or ph-ph or 1ph Voltage
IEC10000044 V2 EN
Figure 281:
Signal flow for a single transformer with voltage control
On the HV side, the three-phase current is normally required in order to feed the three-
phase over current protection that blocks the load tap changer in case of over-current
above harmful levels.
The voltage measurement on the LV-side can be made single phase-earth. However,
it shall be remembered that this can only be used in solidly earthed systems, as the
measured phase-earth voltage can increase with as much as a factor √3 in case of earth
faults in a non-solidly earthed system.
The analog input signals are normally common with other functions in the IED for
example, protection functions.
The LV-busbar voltage is designated U
B
, the load current I
L
and load
point voltage U
L
.
Automatic voltage control for a single transformer
Automatic voltage control for tap changer, single control TR1ATCC measures the
magnitude of the busbar voltage U
B
. If no other additional features are enabled (line
voltage drop compensation), this voltage is further used for voltage regulation.
1MRK 502 071-UEN -
Section 15
Control
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
551
Application manual
Содержание Relion REG670
Страница 1: ...RELION 670 SERIES Generator protection REG670 Version 2 2 IEC Application manual...
Страница 2: ......
Страница 108: ...102...
Страница 132: ...126...
Страница 324: ...318...
Страница 442: ...436...
Страница 476: ...470...
Страница 628: ...622...
Страница 718: ...712...
Страница 728: ...722...
Страница 768: ...762...
Страница 778: ...772...
Страница 779: ...773...