Operate
Angle1(2 ) = 180
o
Power1(2)
P
Q
IEC06000557-2-en.vsd
IEC06000557 V2 EN
Figure 200:
For reverse power the set angle should be 180° in the overpower
function
TripDelay1(2)
is set in seconds to give the time delay for trip of the stage after pick up.
Hysteresis1(2)
is given in p.u. of generator rated power according to equation
3
N
S
UBase IBase
=
×
×
EQUATION1708 V1 EN
(Equation 236)
The drop out power will be
Power1(2) - Hysteresis1(2)
.
The possibility to have low pass filtering of the measured power can be made as shown
in the formula:
(
)
1
Old
Calculated
S
k S
k S
= ×
+ -
×
EQUATION1893 V1 EN
(Equation 237)
Where
S
is a new measured value to be used for the protection function
S
old
is the measured value given from the function in previous execution cycle
S
Calculated
is the new calculated value in the present execution cycle
k
is settable parameter
Section 9
1MRK 502 071-UEN -
Current protection
386
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Application manual
Содержание Relion REG670
Страница 1: ...RELION 670 SERIES Generator protection REG670 Version 2 2 IEC Application manual...
Страница 2: ......
Страница 108: ...102...
Страница 132: ...126...
Страница 324: ...318...
Страница 442: ...436...
Страница 476: ...470...
Страница 628: ...622...
Страница 718: ...712...
Страница 728: ...722...
Страница 768: ...762...
Страница 778: ...772...
Страница 779: ...773...