63
PCB 2 (main PCB LP2)
X8
X11
X7
1 2 3 4 5
910111213
1 2 3 4 5
910111213
3 2 1
6 7 8
6 7 8
X15
X16
X9
X10
~
Consecutive number 1 of the termi-
nals
The terminals of PCB 2 (operating com-
ponents 230 V) are designated as fol-
lows:
Example: Terminal
2X7.3
2
PCB 2 (LP2)
X7. Terminal strip 7
3
Terminal 3
Connection options on PCB 2 (LP2)
■ Terminals 2X7.1 to 2X7.13
■ Terminals 2X8.1 to 2X3.13
Installation sequence
Overview of power connections
(cont.)
5368 522 UAE
Installation
Summary of Contents for Vitocal 300-G BW
Page 57: ...57 6 1 2 4 3 5 A 5x Installation sequence Opening the heat pump 5368 522 UAE Installation...
Page 213: ...213 5368 522 UAE...
Page 214: ...214 5368 522 UAE...
Page 215: ...215 5368 522 UAE...