4. Only for commissioning:
Check the connections for possible
leaks. Replace faulty or displaced
seals.
5.
Check the primary circuit pressure.
The pressure should be approx.
2 bar.
Filling and venting the heating water side
A
A
Fill & drain valve
1.
Open any non-return valves installed
on site.
2.
Check the pre-charge pressure of the
expansion vessel (see page 104).
3.
Thoroughly flush the on-site pipe-
work.
4.
Fill the heating circuit via fill & drain
valve
A
with water; during filling,
check the system pressure at the
pressure gauge.
Minimum system pres-
sure
0.8 bar
Permissible operating
pressure
3 bar
5.
Close fill & drain valve
A
.
6.
Open a suitable air vent valve in the
heating circuit.
7.
!
Please note
To prevent equipment dam-
age, check the flow and return
connections of the secondary
heat pump circuit for
leaks
.
In case of leaks, immediately
shut off the equipment, drain
the water and check the seat-
ing of the seal rings. Replace
all seal rings that may have
slipped.
8.
Switch ON the power.
9.
Remove the cause if the phase mon-
itor has responded. The relay does
not need to be reset.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5368 522 UAE
Service
Summary of Contents for Vitocal 300-G BW
Page 57: ...57 6 1 2 4 3 5 A 5x Installation sequence Opening the heat pump 5368 522 UAE Installation...
Page 213: ...213 5368 522 UAE...
Page 214: ...214 5368 522 UAE...
Page 215: ...215 5368 522 UAE...