109
1.
The display shows system compo-
nent that were entered under "Pro-
gramming" (step 4 of the commis-
sioning assistant). Individual compo-
nents can be chosen via the selection
keys below the display.
After selection, the system overview
appears on the display to assist with
the commissioning steps.
2.
Pressing key "
F
" twice brings the
commissioning to an end.
Operating instructions and the
following table
Commissioning programs
System components
Aim
Control unit tasks
"Heating circ. 1"
Venting
Starting the secondary pump
and heating circuit pump 1.
"Heating circ. 2"
,
"Heating circ. 3"
Venting
Heating circuit pump 2/3. Open/
close mixer every 5 minutes.
(Separate)
"Cooling
circuit"
Venting
Start primary pump and cooling
circuit pump (by enabling the NC
output). Open/close mixer every
5 minutes.
"DHW"
(DHW cylinder)
Venting
Start secondary pump and cir-
culation pump for cylinder heat-
ing. Change over diverter valve
heating/DHW every minute or
start the circulation pump for cyl-
inder heating..
"Swimming pool"
Venting
Start secondary pump. Switch
swimming pool water output on/
off every minute.
"Electric heater"
(instantaneous heating
water heater)
Function check
Start secondary pump. Regulate
the electric heater to 35°C flow
temperature
"Heat pump"
Function check
Start the primary and the secon-
dary pump. Regulate the heat
pump to a return temperature to
the heating circuit of 30 °C.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5368 522 UAE
Service
Summary of Contents for Vitocal 300-G BW
Page 57: ...57 6 1 2 4 3 5 A 5x Installation sequence Opening the heat pump 5368 522 UAE Installation...
Page 213: ...213 5368 522 UAE...
Page 214: ...214 5368 522 UAE...
Page 215: ...215 5368 522 UAE...