6
DHW with electric heating.................................................................................... 150
Control settings, electric heater
Instantaneous heating water heater..................................................................... 151
Electric heating..................................................................................................... 151
Max. stage electric booster heater....................................................................... 152
Stage for power-OFF............................................................................................ 152
Control settings, hydraulics
Heat pump for drying buildings............................................................................. 153
Screed program.................................................................................................... 153
Set flow temperature, external demand............................................................... 155
Control settings, heating water buffer cylinder
Buffer cylinder...................................................................................................... 157
Buffer cylinder switching times............................................................................. 157
Fixed temperature................................................................................................ 157
Hysteresis............................................................................................................. 158
Max. temperature................................................................................................. 159
Control settings, heating circuits
Standard room temperature................................................................................. 160
Reduced room temperature................................................................................. 160
Heating circuit switching times............................................................................. 160
Activating the remote control................................................................................ 160
Heating curve level............................................................................................... 161
Heating curve slope.............................................................................................. 161
Room hook-up slope............................................................................................ 161
Room temperature hook-up (heating circuit)........................................................ 162
Maximum flow temperature.................................................................................. 163
Cooling control settings
Cooling................................................................................................................. 164
Cooling circuit....................................................................................................... 164
Room temperature separate cooling circuit.......................................................... 164
Min. flow temperature........................................................................................... 165
Room hook-up slope, separate cooling circuit..................................................... 165
Cooling curve level/slope..................................................................................... 165
Control settings, time
Automatic summer/winter time changeover......................................................... 167
Index
Index
5368 522 UAE
Summary of Contents for Vitocal 300-G BW
Page 57: ...57 6 1 2 4 3 5 A 5x Installation sequence Opening the heat pump 5368 522 UAE Installation...
Page 213: ...213 5368 522 UAE...
Page 214: ...214 5368 522 UAE...
Page 215: ...215 5368 522 UAE...