The terminals of PCB 3 (sensors and KM
BUS) are designated as follows:
Example: Terminal
3X2.10
3
PCB 3 (LP3)
X2. Terminal strip 2
10 Terminal 10
Connection options on PCB 3 (LP3)
■ Terminals 3X1.1 to 3X1.27
■ Terminals 3X2.1 to 3X2.27
■ Sensor terminals F0 to F23
Note
The consecutive numbers of the termi-
nals are not the same as the sensor des-
ignation.
Inserting cables/leads
When routing on-site cables/leads, observe the location of the cable entries into the
appliance on its back (see page 11).
Installation sequence
Overview of power connections
(cont.)
5368 522 UAE
Summary of Contents for Vitocal 300-G BW
Page 57: ...57 6 1 2 4 3 5 A 5x Installation sequence Opening the heat pump 5368 522 UAE Installation...
Page 213: ...213 5368 522 UAE...
Page 214: ...214 5368 522 UAE...
Page 215: ...215 5368 522 UAE...