2
Maintaining the DSQ II
Preparing the DSQ II for Maintenance
Thermo Scientific
DSQ II Hardware Manual
25
Preparing the DSQ II for Maintenance
Before you can perform any maintenance on the DSQ II, you must shut down the system and
remove the covers. The DSQ II covers overlap, so they must be removed in the order of front,
top, right and left as you face the front of the instrument.
Removing the Front and Top Covers
To remove the front and top covers, you will need a Phillips #2 screwdriver.
1. Cover the work area with a lint-free cloth.
Figure 10.
Components Accessed by Removing the Top and Front Covers
1
Power Module
3
Calibration Gas Flow Module
2
CI Reagent Gas Flow Module
(Upgrade Option)
4
Ion Gauge (Upgrade Option)
2
1
3
4
Summary of Contents for DSQ II
Page 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Page 4: ......
Page 8: ......
Page 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Page 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Page 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Page 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Page 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...