1
Basic Operations
Installing a Column into the GC/MS System
Thermo Scientific
DSQ II Hardware Manual
11
Method One
If you have a column measuring tool, follow these steps:
1. Screw the transfer line nut onto the column measuring tool.
2. Push the column past the end of the column measuring tool and use a scoring wafer to
score and break the end of the column. Use a magnifying glass to check for an even, flat
cut. Repeat if necessary.
Figure 4.
Column Measuring Tool
3. Pull the column back so that it is flush with the end of the column measuring tool.
Tighten the transfer line nut.
4. Slide the septum up to the back of the transfer line nut.
5. Remove the column, transfer line nut and ferrule from the column measuring tool.
Tip
Slide a septum on the column before adding the transfer line nut to make it easier
to measure the proper distance between the nut and the end of the column. You can
also use a white marker to mark the position of the column and nut.
1
Column Measuring Tool*
4
Column
2
Transfer Line Ferrule
5
Septum
3
Transfer Line Nut
* The Column Measuring Tool is sold separately and can be purchased from Thermo Fisher Scientific.
1
5
2
3
4
Summary of Contents for DSQ II
Page 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Page 4: ......
Page 8: ......
Page 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Page 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Page 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Page 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Page 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...