144
Sample Policy Master upgrade scenarios
Upgrade scenario details
Performing a verified upgrade without importing systems
This scenario assumes that you have a 2.0.1 Policy Master cluster with two
systems.
This scenario requires a verification phase. During the verification phase, both
the VCS One 2.0.1 and the 5.0 Policy Master clusters are running. The VCS One
2.0.1 clients should use the 2.0.1 Policy Master cluster.
Performing a verified upgrade without importing systems
Summary of Contents for Veritas Cluster Server One
Page 1: ...Veritas Cluster Server One Installation Guide AIX HP UX Linux Solaris 5 0...
Page 3: ...Symantec Corporation 350 Ellis Street Mountain View CA 94043 http www symantec com...
Page 16: ...16 Contents...
Page 34: ...34 Getting ready to install VCS One Configuring ssh rsh or remsh before installing...
Page 82: ...82 Installing the Simulator Installing the Simulator...
Page 126: ...126 Upgrading from VCS One 2 0 1 to 5 0 Upgrading the client...
Page 148: ...148 Sample Policy Master upgrade scenarios Upgrade scenario details...
Page 194: ...194 Sample installation output Installing the VCS One client...
Page 210: ...210 Index...