
137
Sample Policy Master upgrade scenarios
Upgrade scenario details
Upgrade scenario details
This section provides instructions for each of the upgrade scenarios.
For information about the different scenarios, see: “
Upgrade scenario overview
”
on page 136.
Performing a simplified upgrade and importing two new systems
Use this upgrade scenario for a test environment or production environment. If
the VCS One 5.0 Policy Master upgrade fails, you can roll your configuration
back to VCS One 2.0.1.
This scenario has no verification phase, and requires you to import two new
systems. This upgrade scenario has the shortest down time, and the fewest
steps.
Installing the VCS One 5.0 Policy Master on two new systems
Follow the instructions in this section to install the Policy Master on two new
systems in the Policy Master cluster. When the installation is complete, the new
VCS One 5.0 systems (Node3 and Node4) replace the previous 2.0.1 systems
(Node1 and Node2).
To install the VCS One 5.0 Policy Master on two new systems
1
Check that Node3 and Node4 are running an operating system that VCS One
5.0 supports. Do one of the following:
Figure B-1
Performing a simplified upgrade and importing two new systems
Summary of Contents for Veritas Cluster Server One
Page 1: ...Veritas Cluster Server One Installation Guide AIX HP UX Linux Solaris 5 0...
Page 3: ...Symantec Corporation 350 Ellis Street Mountain View CA 94043 http www symantec com...
Page 16: ...16 Contents...
Page 34: ...34 Getting ready to install VCS One Configuring ssh rsh or remsh before installing...
Page 82: ...82 Installing the Simulator Installing the Simulator...
Page 126: ...126 Upgrading from VCS One 2 0 1 to 5 0 Upgrading the client...
Page 148: ...148 Sample Policy Master upgrade scenarios Upgrade scenario details...
Page 194: ...194 Sample installation output Installing the VCS One client...
Page 210: ...210 Index...