123
Upgrading from VCS One 2.0.1 to 5.0
Upgrading the Policy Master
4
Enter a unique ID between 0-65535. For example, enter the following:
Cluster ID Number:
4333
You see a list of information that is required to configure the Policy Master.
5
Enter the NIC for the Policy Master virtual IP address. For example:
■
(On Linux)
eth0
■
(On Solaris x64)
bge0
6
At the prompt, specify whether or not you want to use the same NIC on all
of the Policy Master systems.
Type
y
to use the same NIC on all of the Policy Master systems. Type
n
to
use different NICs for different Policy Master systems.
If more than one base IP address is detected, select a base IP address.
7
Do one of the following:
8
Enter one or more virtual IP addresses for the Policy Master. For example,
enter the following:
192.168.1.102
9
Enter the netmask for the Policy Master virtual IP address. For example,
enter the following:
255.255.252.0
10
Verify that the virtual IP address and NIC information is correct. Enter the
following:
y
.
11
At the prompt, allow the Policy Master to restart. Enter the following:
y
.
You see a message stating whether the ID and virtual IP address were
updated successfully.
Verify that the ID and virtual IP addresses were updated
successfully
To verify that the ID and virtual IP addresses were updated successfully
1
Enter the following:
#
/opt/VRTSvcsone/bin/hagrp -state
2
Verify that the new virtual IP address is enabled. Enter the following:
#
ifconfig -a
If you are not prompted the
select a base IP address
Go to
step 8
.
If you are prompted the select
a base IP address
Select a base IP address.
Then go to
step 8
.
Summary of Contents for Veritas Cluster Server One
Page 1: ...Veritas Cluster Server One Installation Guide AIX HP UX Linux Solaris 5 0...
Page 3: ...Symantec Corporation 350 Ellis Street Mountain View CA 94043 http www symantec com...
Page 16: ...16 Contents...
Page 34: ...34 Getting ready to install VCS One Configuring ssh rsh or remsh before installing...
Page 82: ...82 Installing the Simulator Installing the Simulator...
Page 126: ...126 Upgrading from VCS One 2 0 1 to 5 0 Upgrading the client...
Page 148: ...148 Sample Policy Master upgrade scenarios Upgrade scenario details...
Page 194: ...194 Sample installation output Installing the VCS One client...
Page 210: ...210 Index...