AC-22
Refrigerant Charging Procedure
HVAC SYSTEM (HEATER, VENTILATOR AND A/C)
4. Refrigerant Charging Proce-
dure
A: PROCEDURE
CAUTION:
• During operation, be sure to wear protective
goggles and protective gloves.
• Before charging the refrigerant, evacuate the
system to remove small amounts of moisture
remaining in the system.
The moisture in the system can be completely
evacuated only under the minimum vacuum
level. The minimum vacuum level affects the
temperature in the system.
• The list below shows the vacuum values nec-
essary to boil water at various temperatures. In
addition, the vacuum levels indicated on the
gauge are approx. 3.3 kPa (25 mmHg, 0.9
8
inHg)
lower than those measured at 304.
8
m (1,000 ft)
above sea level.
1) Close the valves on low/high pressure sides of
the manifold gauge.
2) Install the low/high pressure hoses to the corre-
sponding service ports on the vehicle.
3) Connect the center hose of the manifold gauge
set with the vacuum pump.
4) Carefully open the valves on the low/high pres-
sure sides to activate the vacuum pump.
5) After the low-pressure gauge reaches 100.0 kPa
(750 mmHg, 29.5 inHg) or higher, evacuate the
system for approx. 15 minutes. (Continue evacua-
tion).
6) After 15 minutes of evacuation, if the reading
shows 100.0 kPa (750 mmHg, 29.5 inHg) or higher,
close the valves on the both sides to stop the vac-
uum pump.
Vacuum level required to boil water (at sea level)
Temperature
Vacuum
1.7°C (35°F)
100.9 kPa (757 mmHg, 29.8 inHg)
7.2°C (45°F)
100.5 kPa (754 mmHg, 29.7 inHg)
12.8°C (55°F)
99.8 kPa (749 mmHg, 29.5 inHg)
18.3°C (65°F)
99.2 kPa (744 mmHg, 29.3 inHg)
23.9°C (75°F)
98.5 kPa (739 mmHg, 29.1 inHg)
29.4°C (85°F)
97.2 kPa (729 mmHg, 28.7 inHg)
35°C (95°F)
95.8 kPa (719 mmHg, 28.3 inHg)
(A) Low-pressure gauge
(Compound pressure gauge)
(B) High-pressure gauge
(C) Close
AC-00023
(A)
(B)
(C)
(C)
(A) Low-pressure gauge
(Compound pressure gauge)
(B) High-pressure gauge
(C) Slowly open
(D) Vacuum pump turn on
(A) Low-pressure gauge
(Compound pressure gauge)
(B) High-pressure gauge
(C) Close
(D) Vacuum pump turn off
AC-00024
(A)
(B)
(D)
(C)
(C)
AC-00025
AC-00026
(A)
(B)
(D)
(C)
(C)
asieps_tobira.book 22 ページ 2012年2月10日 金曜日 午後3時26分
Summary of Contents for B9 TRIBECA WX 2007
Page 2: ...HOW TO USE THIS MANUALS HU Page 1 How to Use This Manuals 2 asieps_tobira book 1...
Page 8: ...SPECIFICATIONS SPC Page 1 B9 TRIBECA 2 asieps_tobira book 1...
Page 14: ...RECOMMENDED MATERIALS RM Page 1 Recommended Materials 2 asieps_tobira book 1...
Page 24: ...IDENTIFICATION ID Page 1 Identification 2 asieps_tobira book 1...
Page 40: ...NOTE NT Page 1 Note 2 asieps_tobira book 1...
Page 45: ...RM 6 Recommended Materials RECOMMENDED MATERIALS asieps_tobira book 6...
Page 46: ...PRE DELIVERY INSPECTION PI Page 1 Pre delivery Inspection 2 asieps_tobira book 1...
Page 52: ...PRECAUTION PC Page 1 Precaution 2 asieps_tobira book 1...
Page 75: ...AB 24 Front Sub Sensor AIRBAG SYSTEM asieps_tobira book 24...
Page 237: ...BS 24 Body Sealing BODY STRUCTURE View A View B BS 01657 Ft BS 01705 asieps_tobira book 24...
Page 239: ...BS 26 Body Sealing BODY STRUCTURE View F View G BS 01662 Ft BS 01663 Upr asieps_tobira book 26...
Page 263: ...COM 6 Horn Switch COMMUNICATION SYSTEM asieps_tobira book 6...
Page 329: ...ET 36 Steering Satellite Switch ENTERTAINMENT asieps_tobira book 36...
Page 661: ...asieps_tobira book 2...