BRKT
Bracket unit
7-33
6AL3J11
6.
Remove the special service tool
2
.
WARNING
Make sure that the trim and tilt rams are
fully extended when removing the special
service tool
2
, otherwise fluid can spurt
out from the unit due to internal pressure.
7.
Install the pipe joint at the end
a
, and
then tighten the pipe joints
1
to the
specified torque.
8.
Connect the PTT motor leads to the bat-
tery terminals to fully retract the trim and
tilt rams.
9.
Loosen the pipe joints
3
, and then
remove the pipe joint at the end
b
.
WARNING
Make sure that the trim and tilt rams are
fully retracted when removing the pipe
joints
3
, otherwise fluid can spurt out
from the unit due to internal pressure.
10. Install the special service tool
2
.
NOTE:
Put the PTT unit in the drain pan.
11. Connect the PTT motor leads to the bat-
tery terminals to extend the trim rams,
and then measure the hydraulic pres-
sure.
12. Reverse the PTT motor leads between
the battery terminals to fully retract the
trim and tilt rams.
T
R
.
.
Pipe joint
1
:
15 N
·
m (1.5 kgf
·
m, 11.1 ft
·
lb)
PTT oil pressure gauge assembly
2
:
90890-06580
Ram
PTT motor lead
Battery
terminal
Up
Sky blue (Sb)
+
Light green (Lg)
-
Hydraulic pressure (up):
13.0
–
15.0 MPa (130
–
150 kgf/cm
2
)
Summary of Contents for Fin Whale 225 EFI
Page 1: ...Grey Whale 200 EFI Fin Whale 225 EFI SERVICE MANUAL...
Page 4: ......
Page 87: ...6AL3J11 4 18 1 2 3 4 5 6 7 8 9 S6AL4240 7 8 Throttle body...
Page 183: ...6AL3J11 5 82 1 2 3 4 5 6 7 8 9 MEMO Cylinder block...
Page 364: ...ELEC Electrical system 8 53 6AL3J11 MEMO...
Page 397: ......
Page 398: ......