POWR
Power unit
5-79
6AL3J11
2.
Clean the power unit mating surface, and
install the dowels
1
and a new gasket
2
.
3.
Install the power unit by installing the
bolts
3
and
4
, and then tightening them
to the specified torque.
NOTE:
Be sure to install the shift rod assembly onto
the bottom cowling before installing the
power unit.
4.
Install the upper case cover
5
and
aprons
6
.
5.
Install the speed sensor coupler
7
to the
bracket.
6.
Connect the flushing hose
8
.
7.
Connect the warning indicator coupler
9
, trim sensor coupler
0
, isolator cou-
pler
A
, water detection switch coupler
(blue)
B
, PTT switch coupler
C
, 10-pin
main harness coupler
D
, LAN communi-
cation coupler (white)
E
, and then install
them onto the brackets.
T
R
.
.
Power unit mounting bolt
3
and
4
:
42 N
·
m (4.2 kgf
·
m, 31.0 ft
·
lb)
S6AL5530
3
3
4
1
LT
572
LT
LT
572
LT
3
2
3
3
3
3
4
4
4
T
R
.
.
Apron bolt and upper case cover
bolt:
8 N
·
m (0.8 kgf
·
m, 5.9 ft
·
lb)
8
7
S6AL5540
Summary of Contents for Fin Whale 225 EFI
Page 1: ...Grey Whale 200 EFI Fin Whale 225 EFI SERVICE MANUAL...
Page 4: ......
Page 87: ...6AL3J11 4 18 1 2 3 4 5 6 7 8 9 S6AL4240 7 8 Throttle body...
Page 183: ...6AL3J11 5 82 1 2 3 4 5 6 7 8 9 MEMO Cylinder block...
Page 364: ...ELEC Electrical system 8 53 6AL3J11 MEMO...
Page 397: ......
Page 398: ......