- 7 -
CO
2
span calibration
(Ex
䠅
When setting CO
2
density is 5.0% and actual CO
2
density is 4.5%:
Process Operation MENU
1
Put densitometer thorough the sample port at the front side of the unit to measure
chamber CO
2
density.
2
Select Tools in the Top Screen.
Tools
3
Select Tools (1/2) is displayed. Select temp / CO
2
Calibration and press OK key.
OK
4
By pressing digit shift key and numerical value shift key, input actual CO
2
density
䠄
4.5%
䠅
in the column CO
2
Span. Select OK and press ENTER key.
OK
5
Automatically reverts to Select Tools (1/2) screen.
*Note
㻌
(1) Input range: +1.0% ~ -1.0% (per input).
(2) Repeat CO2 calibration for several times until displayed CO2 density will match with
actual density.
(3) It is permitted to commence CO2 span calibration only when setting CO2 density is 5.0
䠂
.
CO
2
span calibration
䠘
Display of Process-2
䠚
䠘
Display of Process-3
䠚
Summary of Contents for MCO-19M
Page 7: ... 4 Dimensions Power cord ...
Page 16: ...Wiring diagram 13 ...
Page 17: ...Circuit diagram Main PCB 14 ...
Page 18: ... LCD PCB 15 ...
Page 110: ...MCO 19M UVH MCO 19M UV MCO 19M Multi Gas Incubator INSTRUCTION MANUAL 107 ...
Page 112: ...CONTENTS SPECIFICATIONS P 74 PERFORMANCE P 75 SAFETY CHECK SHEET P 76 109 2 ...
Page 183: ...Fig A Stacking plate B Stacking plate A Protective sticker Front panel Hook Front 180 73 ...
Page 187: ...SANYO Electric Co Ltd Printed in Japan DC3186 150B ...