41
14. Protective conductor terminal
The terminal for ground. Connect this terminal to grounding port permanently.
15. Clamp
The clamp to fix the AC power cable.
16. Controller air-cooling outlet
The air-cooling outlet for the controller.
*1: This port is equipped when the optional network unit (EtherNet/IP unit, PROFINET unit) is installed.
*2: This port is equipped when the optional expansion board is installed.
ME-LPRH-SM-3
Summary of Contents for LP-RH Series
Page 19: ...1 Product Overview ME LPRH SM 3...
Page 42: ...2 Laser Marker Installation ME LPRH SM 3...
Page 68: ...3 Operation Method ME LPRH SM 3...
Page 90: ...4 External Control Using I O ME LPRH SM 3...
Page 138: ...5 External Control by Communication Commands ME LPRH SM 3...
Page 147: ...6 Link Control with External Devices ME LPRH SM 3...
Page 172: ...7 Maintenance ME LPRH SM 3...
Page 201: ...Troubleshooting ME LPRH SM 3...
Page 236: ...Index ME LPRH SM 3...
Page 239: ......