VJ-1324X OPERATION MANUAL
Maintenance
6.4 Moving or transporting the printer
231
(2) Reinstalling
After moving the printer, follow the procedure below to set it ready for use.
1. Select a suitable place for installation.
Installation manual
2. Move and install the printer to the location.
3. When using the stands, make sure that the stands and the wing bolts (2 pieces) retaining the printer
are not loose.
4. Attach cables, such as the power cable.
3.7 Connecting the printer to PC
5. Perform Nozzle check, and then confirm that there is no clogging in the print head.
6. Perform Alignment.
6.4.2
Transporting the printer
When transporting the printer, make sure to pack it in the same condition as purchased, using protective
and packing materials to protect the printer from vibration and shocks.
NOTE
• When transporting the printer, consult the MUTOH product dealer at your point of purchase.
Summary of Contents for ValueJet VJ1324X
Page 1: ...VJ1324XE A 02 VJ1324X ...
Page 2: ......
Page 12: ...Table of Contents VJ 1324X OPERATION MANUAL 12 ...
Page 106: ...Before using VJ 1324X OPERATION MANUAL 106 3 7 Connecting the printer to PC ...
Page 232: ...Maintenance VJ 1324X OPERATION MANUAL 232 6 4 Moving or transporting the printer ...
Page 256: ...Appendix VJ 1324X OPERATION MANUAL 256 8 3 Options Supply list ...
Page 264: ......