A - 13
4. INSTALLATION AND WIRING
4- 1 to 4-16
4.1 Motion controller Installation ......................................................................................................................4- 1
4.1.1 Instructions for handling ......................................................................................................................4- 1
4.1.2 Motion controller Installation ...............................................................................................................4- 2
4.1.3 Instructions for mounting the Motion controller ..................................................................................4- 3
4.2 Connection and disconnection of Cable....................................................................................................4- 6
4.2.1 SSCNET cable .................................................................................................................................4- 6
4.2.2 24VDC power supply cable ............................................................................................................... 4-12
4.3 Wiring......................................................................................................................................................... 4-13
4.3.1 Instructions for wiring ......................................................................................................................... 4-13
4.3.2 Connecting to the power supply module ........................................................................................... 4-16
5. TRIAL OPERATION AND ADJUSTMENT
5- 1 to 5- 8
5.1 Checklist before Trial Operation ................................................................................................................5- 1
5.2 Trial Operation and Adjustment Procedure...............................................................................................5- 2
5.3 Operating System Software Installation Procedure..................................................................................5- 6
5.4 Trial Operation and Adjustment Checklist.................................................................................................5- 7
6. INSPECTION AND MAINTENANCE
6- 1 to 6-26
6.1 Maintenance Works ...................................................................................................................................6- 2
6.1.1 Instruction of Inspection works ...........................................................................................................6- 2
6.2 Daily Inspection ..........................................................................................................................................6- 4
6.3 Periodic Inspection.....................................................................................................................................6- 5
6.4 Life ..............................................................................................................................................................6- 6
6.5 Battery ........................................................................................................................................................6- 7
6.5.1 Battery life............................................................................................................................................6- 8
6.5.2 Battery replacement procedure ......................................................................................................... 6-10
6.5.3 Resuming operation after storing the Motion controller .................................................................... 6-11
6.5.4 Symbol for the new EU Battery Directive .......................................................................................... 6-11
6.6 Troubleshooting ........................................................................................................................................ 6-12
6.6.1 Troubleshooting basics ...................................................................................................................... 6-12
6.6.2 Troubleshooting of Motion CPU module ........................................................................................... 6-13
6.6.3 Confirming error code ........................................................................................................................ 6-24
6.6.4 I/O circuit troubleshooting .................................................................................................................. 6-25
7. POSITIONING DEDICATED SIGNALS
7- 1 to 7-36
7.1 Device List ..................................................................................................................................................7- 1
7.2 Internal relays ............................................................................................................................................7- 2
7.2.1 Internal relay list ..................................................................................................................................7- 2
7.2.2 Axis status list......................................................................................................................................7- 4
7.2.3 Axis command signal list.....................................................................................................................7- 5
7.2.4 Virtual servomotor axis status list .......................................................................................................7- 6
7.2.5 Virtual servomotor axis command signal list ......................................................................................7- 7
7.2.6 Synchronous encoder axis status list .................................................................................................7- 8
Summary of Contents for MR-MQ100
Page 1: ......
Page 19: ...A 18 MEMO ...
Page 73: ...3 12 3 DESIGN MEMO ...
Page 97: ...5 8 5 TRIAL OPERATION AND ADJUSTMENT MEMO ...
Page 159: ...7 36 7 POSITIONING DEDICATED SIGNALS MEMO ...
Page 167: ...8 8 8 PARAMETERS FOR POSITIONING CONTROL MEMO ...
Page 189: ...9 22 9 SERVO PROGRAMS FOR POSITIONING CONTROL MEMO ...
Page 205: ...10 16 10 MOTION SFC PROGRAMS MEMO ...
Page 245: ...14 4 14 ERROR CODE MEMO ...
Page 253: ...15 8 15 EMC DIRECTIVES MEMO ...
Page 267: ...App 14 APPENDICES MEMO ...
Page 270: ......
Page 271: ......