- 22 -
[
II
Restrictions ]
SW4-7:OFF (Compressor ON/OFF, NIGHT MODE)
SW4-7:ON (STEP DEMAND)
Example of wiring connection
CN3D 1-3P
Compressor ON/OFF
CN3D 1-2P
NIGHT MODE
Open
OFF
Open
OFF
Short-circuit
ON
Short-circuit
ON
CN3D 1-2P
Open
Short-circuit
CN3D 1-3P
Open
100% (not on the
on-DEMAND control)
75%
Short-circuit
0%
50%
If the step listed as the wrong example above is taken, thermo may go off.
The percentage of the demand listed in the table above is an approximate value based on the
compressor volume and does not necessarily correspond with the capacity.
(Wrong)
(Correct)
100%
100%
0%
75%
50%
50%
Demand control
steps
Note the following steps to be taken when using the STEP DEMAND
(Example) When switching from 100% to 50%
CN51
Remote controller board
Controller board on
outdoor (heat source) unit
Relay circuit
CN51
X
Y
X
Y
5
4
3
1
2
3
Maximum allowable wiring length = 10 m
L1 : Error indicator lamp/freeze prevention output
L2 : Compressor operation display lamp
X,Y : Relay (For 12V DC coil rating 0.9 W or below)
L
1
L
2
Field-installed
CN3D
Remote controller board
Controller board on
outdoor (heat source) unit
Relay circuit
CN3D
X
Y
X
Y
Maximum allowable wiring length = 10 m
SW1 : NIGHT MODE command or Compressor ON/OFF
SW2 : Compressor ON/OFF command
X,Y : Relay (Rated contact DC 15 V 0.1 A or above
Minimum applied load 1 mA or below)
SW1
SW2
Field-installed
Lamp power supply
Relay power supply
Summary of Contents for City Multi CMB-P1016NU-G
Page 11: ... 2 ...
Page 23: ... 14 ...
Page 25: ... 16 ...
Page 38: ... 29 II Restrictions ...
Page 42: ... 33 II Restrictions ...
Page 46: ... 37 II Restrictions ...
Page 50: ... 41 II Restrictions ...
Page 54: ... 45 II Restrictions ...
Page 58: ... 49 II Restrictions ...
Page 75: ... 66 ...
Page 87: ... 78 ...
Page 89: ... 80 ...
Page 99: ... 90 ...
Page 101: ... 92 ...
Page 111: ... 102 ...
Page 113: ... 104 ...
Page 129: ... 120 ...
Page 163: ... 154 ...
Page 165: ... 156 ...
Page 187: ... 178 ...
Page 313: ... 304 ...