6. Align right side carrier leg (A) with header brackets, and
install M20x40 bolt (B) with hardened washer (C).
7. Install hardened washer (D), spacer (E),
fl
oat tension
arm (F), and
fl
anged lock nut (G) on bolt (B).
8. Torque bolt (B) to 250 lbf
·
ft (339 N
·
m).
Figure 4.275: Right Side Carrier Leg
9. Undo strapping or wire supporting driveline to hitch
(D), and connect driveline (E) to header drive gearbox.
Refer to
Installing Clutch Driveline, page 201
10. Remove hex head bolts (A) and spacers (B)
from gearbox.
11. Undo strapping or wire supporting steering arm
to hitch, and position steering arm weldment (C)
on gearbox.
12. Secure steering arm to gearbox with spacers (B) and
hex head bolts (A). Apply red Loctite
®
to front holes and
torque bolts to 150 lbf
·
ft (203 N
·
m).
Figure 4.276: Aft Driveline and Hitch
13. Undo strapping or wire securing center-link (B) and
indicator links (F) to carrier frame.
14. Remove pins and hardware from anchor (C).
15. Attach center-link (B) to anchor (C) with clevis pin (A)
and secure with cotter pin.
16. Attach indicator links (F) to anchor with clevis pin (D)
and washers (E). Install washers (E) on both sides of
each indicator link (F).
Figure 4.277: Center-Link and Indicator Links
169820
242
Revision A