Issue 5
May 1997
2-i
2
Installation Procedures
Contents
Handling and Uncrating
1
■
Handling Considerations
1
■
Uncrating Procedure
1
Inspection
2
■
Inspection and Physical Verification
2
Erecting and Placement
3
■
Floor Layout
3
Bay Footprint
3
■
Bay Frame Mounting
5
Grounding Connections
8
■
Grounding - General
8
■
Connections
8
Mounting System Shelves
11
■
MDS Assembly Installation
12
J1C265AB-1 MDS Assembly Mounting Procedure
12
■
ARM Shelf Installation
13
404A User Interface Panel (UIP)
13
ED7C734-30 PIU Mounting Procedure
13
ED7C723-31 DS1 Feeder/Distribution Cable Kit
Mounting Procedure
15
J1C265AA-1 ARM Shelf Mounting Procedure
15
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...