363-208-010
Cabling, Wiring, and Assembly
Issue 5
May 1997
3-113
Reliance INTS Control Link Cable ED7C723-34 Group 17
This cable is the control link with the INTS system. Refer to Figure 5-6 in Chapter
5 for its wiring details.
Step 1:
Mate the J44A connector of the cable assembly with the associated
cable connector of the Reliance INTS shelf.
Step 2:
Mate the cable's P1 connector to the LTF J1 connector.
SLC-2000 /LTF Control Link Cable VA02706-XX
This cable is the control link between each system's ARM shelf and the LTF. One
cable is required for each
SLC-2000 system at the RT site. This is not an Lucent
Technologies cable assembly. Refer to Figure 5-6 in Chapter 5 for wiring details
and ordering information.
Step 1:
Stamp the first cable's RJ-45 connector as LTT-1 and mate with the LTT
1 connector to the LTF.
Step 2:
Mate the cable's P44 connector with the ARM shelf's J44 connector
which is part of the ED7C723-30 G17 dangler cable assembly on the
first
SLC-2000 RT system.
Step 3:
Repeat steps 1 and 2 for each RT system 2 through 8, if necessary,
each time labeling the RJ-45 connector to match the RT system number
and mating to the associated LTF connector.
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...