A-24
Issue 5
May 1997
363-208-010
Applications
Figure A-9A. Typical DC Test Pair Arrangement
Figure A-9B. Test Access Pair Cabling
DC Test Pair
SLC-2000 COT
CU
MDF
MLT
PGTC
Switch
ATU
CENTRAL OFFICE
Term.
CU
SLC-2000 RT
Loop
PTU
REMOTE SITE
MDF
FDI
INH1
P1T
P1R
INH2
P2T
P2R
INH3
P3T
P3R
INH4
P4T
P4R
P120
J120
One COT Frame
MDF
REMOTE
TERMINAL
SITE 1
CENTRAL OFFICE
TERMINAL
J115
P109
J109
(To Next COT
Frame P115)
28 Wire
Cable
From
PGTC to
All
SLC
Systems
Test pair inter.
H
V
P115
RT Frame 2
P301
J301
RT Frame 3
RT Frame 4
RT Frame 1
P301
P301
P301
J301
J301
FDI
V
H
INH6
INH8
P8T
P8R
INH7
P7T
P7R
P6T
P6R
INH8
P5T
P5R
Metallic
Test Pair
TTT
TTR
RT Frame 2
P301
J301
RT Frame 3
RT Frame 4
RT Frame 1
P301
P301
P301
J301
J301
FDI
V
H
DC TEST R
DC TEST T
Metallic
Test Pair
TTT
TTR
DC TEST R
DC TEST T
REMOTE
TERMINAL
SITE 2
1A ATU
Shelf
ARM
Shelf
ARM
Shelf
J301
J301
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...