363-208-010
Cabling, Wiring, and Assembly
Issue 5
May 1997
3-93
DC Test Path Interfaces
General
NOTE
:
This procedure consists of installing the DC Test Path Customer Interface
Cable Assembly (ED7C723-35 Group 12) and mating its connector to the
TAP Cable Assembly (ED7C723-34 Group 1) which had been installed in a
previous section.
NOTE
:
Only one pair on this 50 pin connector is used and is brought out to the
miscellaneous pair panel for cross connection to the DC test pair of the test
access system. Two pairs are reserved for future use and should be tied
back at the cross connect panel.
Connections for ED7C723-35 Group 12
Step 1:
Install the Group 12 Interface Cable Assembly in the left duct and mate
its J301 connector with the P301 connector of the TAP Cable Assembly.
Step 2:
Terminate only the DC Test Pair at the miscellaneous pair panel and
label the leads in accordance with the Figure 3-51.
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...