3-48
Issue 5
May 1997
363-208-010
Cabling, Wiring, and Assembly
Tests
Step 1:
Verify continuity of all installed connections to the customer’s power
plant and ringing supply.
Step 2:
Verify absence of any shorts between the RTN terminals and the -48v or
20 Hz terminals of the Power Interface Unit.
Step 3:
Turn on BDFB circuit breakers and install or power up the associate ring-
ing supplies temporarily.
Step 4:
Verify the presence of -48v dc and ringing voltage at the PIU.
Requirement:
-42 to -56 volts approx. 105 volts ac
Step 5:
Verify the presence of -48v dc at the ARM/UIP -48v (A)/-48v RTN and -
48v (B)/-48v RTN jacks.
Requirement:
-42 to -56 volts dc
Step 6:
Turn off the BDFB breakers and disconnect the two ringing supply
sources.
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...