3-102
Issue 5
May 1997
363-208-010
Cabling, Wiring, and Assembly
Figure 3-54B. INTS/LTF System Interconnections
P171
J175
J130
J131
J132
J133
ARM/UIP
MDS 4
MDS 3
MDS 2
P106
P206
J501
P101
P102
P103
P104
P105
P205
J500
P201
P202
P203
P204
ED7C723-32
P301
P501
Backplane
Fuse Panel
MDS 1
FAN
ED7C723-30
P275
P175
J301-1
J301-2
J301-3
J301-4
TAP to ARM/MDS
J275
J301
ED7C723-34 Group 1
P301
P256
P266
E1-E4
ED7C723-35 G1, 2, or 3
Misc. DF
J101
ED7C723-32
P101
J101
J44
P44
Aux.Power Panel
J44
ED7C723-30 G17
P44
J44A
P44A
RS232 Control Link
Reliance INTS
J400
J116
P400
P116
ED7C723-34 G16
ED7C723-35 G1, 2, or 3
FDI
VF Interface
ED7C723-35
G-1, 2, or 3
P101A
P101B
ED7C723-34 G13
J101A
J101B
DC Test
Pair
VF
Pairs
ED7C723-35
G-1, 2, or 3
P301A
J301A
J301
P301
From Next
RT System
ED7C723-34 G14
ED7C723-34 G11
LTT 8
LTT 8
LTT 2-7
LTT 1
J1
J10
P10
P1
LTT 1
LTT 2-7
RT System 1
RT System 2
RT System 3
RT System 4
RT System 5
RT System 6
RT System 7
RT System 8
P44
LTF
VA02706-XX
ED7C723-34 G17
G10
G2
G7
J305
P305
J801
P801
J183
P183
J183
ED7C723-30
P183
G18
CIT Pipe
ED7C723-34 G15
ED7C723-35 G1, 2, or 3
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...