Step 10: Connect the four pigtails to the PIU while matching the lead designa-
tions to the PIU designations. These leads must be dressed through
the grommeted hole at the bottom of the PIU.
Step 11: With a RT dress the cable assembly up the right duct, as viewed from
the front, and connect P117A to J117. P117B will be left unconnected
and should be located in such a manner as to allow it to reach a
NE00675-31 G1 cable attached to a second DPFU mounted directly
under the first. Secure the cable in the duct.
Step 12: Using two 6 gauge pairs, with 6 gauge crimp lugs (provided with the
DPFU) attached at the DPFU end, attach the lugs to TB1 terminal strip
using the four terminals designated IN, with the leads marked and
specifically attached to terminals designated -48A, Rtn A, -48B and
Rtn B. The other end of the 6 gauge primary pairs should terminate
on the BDFB and should be connected to 45 or50 Amp. breakers,
which will be set to open. For a RT simply dress the leads directly into
the right vertical duct, as viewed from the front.
Step 13: From the Alarms terminal strip run a 22 gauge pair from the 1 and 2
terminals to the MDF or other location, as required for an alarm indica-
tion (loop closure) of loss of A feed.
Step 14: From the Alarms terminal strip run a 22 gauge pair from the 3 and 4
terminals to the MDF or other location, as required for an alarm indica-
tion (loop closure) of loss of B feed.
Turn-up and Test
Step 15: Using a VOM check TB1 (main terminal strip) terminals -48A(Out), -
48B(Out), -48A(In) and -48B(In) for the absence of ground.
Requirement: -42 to -56VDC
Step 16: Turn on the 45 or 50 amp. circuit breakers on the BDFB or elsewhere.
Step 17: With the VOM measure voltage on -48A and -48B Out terminals.
While checking these voltages open and close CBA and CBB to verify
that the circuit breakers are protecting the secondary feeds. Leave
breakers in the on position.
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...