Issue 5
May 1997
ix
Figures
2
Installation Procedures
2-1.
Bay Frame Views
2-2.
Floor Drilling
2-3.
Top of bay Superstructure
2-4.
Grounding Connections
2-5.
7 foot RT Bay Equipment Mounting Locations
2-6.
PIU Mounting Details
2-7.
7 Foot RT Bay FITL Equipment Mounting
2-8.
4TEL RMU with LTF Mounting Arrangement
2-9.
Auxiliary Fuse Panel and
4TEL RMU
Mounting Positions
2-10.
Auxiliary Fuse Panel and Reliance INTS
Mounting Positions
3
Cabling, Wiring, and Assembly
3-1.
Cinch Type Connectors
3-2.
D Type Connectors
3-3.
AMP Mate-N-Lok II Connectors
3-4.
AMP Mate-N-Lok II Assembly
3-5.
SLC-2000 RT Typical Cable Routing
3-6A.
RT Bay cable Assemblies for Metallic Distribution
Application
3-6B.
RT Bay cable Assemblies for Fiber Distribution
(FITL) Application
3-7.
ARM Shelf Cable Assemblies
3-8.
MDS Shelf Cable Assemblies
3-9A.
RT Bay (Metallic) Intershelf Connections
3-9B.
RT Bay (Fiber Application) Intershelf Connections
3-10.
Power Interface Location
3-11.
Power and Ringing Connections
3-12.
MDS Power Cabling
3-13.
Power Connections
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...