363-208-010, Appendix 3
Test Head Installation
Issue 1
November 1998
A3-9
SLC-2000 Access System Circuit Packs
General
These procedures verify that the software and the circuit packs in the
SLC-2000
Access System shelves that are required for the operation of the Lucent
Technologies RTH-7000 or General Signal Networks Tau-tron
ngRTH test head
are present. See Table 1-3 for the circuit packs that must be present in the
SLC-
2000 Access System for the operation of the test head.
Table 1-3.
SLC-2000 Access System Circuit Packs
Circuit Pack Verification
Step 1:
Verify that the SMU, LAN, and PDC are in the ARM shelf.
Step 2:
Verify that the MDC, T8U, and PTU are in the MDS shelf(ves) of the
subscriber circuits or drops to be tested.
NOTE
:
The T8U is required for TR-08 operation only.
Step 3:
Verify that the DLC software is as follows:
RT: R 3.02.01 or R 4.05.00 (or later)
Pack
Location
Description
SMU
ARM Shelf
System Memory Unit
LAN
ARM Shelf
Link to Alarms and Networks
PDC
ARM Shelf
Provisioning and Display Controller
MDC
MDS
Metallic Distribution Controller
T8U *
MDS
TR-08 Unit
PTU
MDS
Power and Test Unit
* The T8U is required for TR-08 operation only.
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...