Issue 5
May 1997
4-i
4
Parts Lists and Kits
Contents
General Information
1
Basic SLC-2000 Hardware
2
■
Factory Assembled RT Bays
2
■
Frame Mounting Material (1 per RT Frame)
2
■
ARM Shelf (1 per RT Frame)
2
■
MDS Assembly (as required)
2
■
HDOS (as required for FITL applications)
3
■
Fan Shelf (as required)
3
■
Power Interface Unit (1 per RT Frame)
3
Cables
4
■
ARM Shelf Dangler Cable Assemblies
4
■
Cable Kits (optional)
4
■
MDS Dangler Cable Assemblies
5
■
Bay Common Cables (1 per RT Frame)
5
■
Bay Common Cables (as required for FITL application)
5
■
Bay Common Cables (as required for remote test applications)
6
■
Peripheral Cables (as required)
7
■
Special Applications Cables
7
Summary of Contents for SLC-2000 Access System Central Office Terminal
Page 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Page 4: ...This page is intentionally blank...
Page 10: ...viii Issue 5 May 1997 Contents...
Page 16: ...xiv Issue 5 May 1997 Tables...
Page 24: ...1 ii Issue 5 May 1997 Contents General Information...
Page 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Page 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...