![LSIS G100 Operation Manual Download Page 120](http://html.mh-extra.com/html/lsis/g100/g100_operation-manual_1944296120.webp)
Advanced Tasks
Use Example
Ref.
operation
motors during low-load and no-load conditions.
Speed search
operation
Used to prevent fault trips when the inverter voltage is
output while the motor is idling or free-running.
Auto restart
operation
Auto restart configuration is used to automatically restart the
inverter when a trip condition is released, after the inverter
stops operating due to activation of protective devices (fault
trips).
2
nd
Motor
Operation
Used to switch equipment operation by connecting two
motors to one inverter. Configure and operate the second
motor using the terminal input defined for the second motor
operation.
Commercial power
source transition
Used to switch the power source to the motor from the
inverter output to a commercial power source, or vice versa.
Cooling fan control Used to control the cooling fan of the inverter.
Timer settings
Set the timer value and control the On/Off state of the multi-
function output and relay.
Brake control
Used to control the On/Off operation of the load’s electronic
braking system.
Multi-function Relay
On/Off control
Set standard values and turn On/Off the output relays or
multi-function output terminals according to the analog input
value.
Press regeneration
prevention
Used during a press operation to avoid motor regeneration,
by increasing the motor operation speed.
* Draw operation is an open loop tension control. This feature allows a constant
tension to be applied to the material that is drawn by a motor-driven device, by fine-
tuning the motor speed using operation frequencies that are proportional to a ratio of
the main frequency reference.
Summary of Contents for G100
Page 14: ......
Page 16: ...5 5 7 5 kW 3 Phase ...
Page 32: ...0 4 0 8 kW 1 5 2 2 kW 4 0 kW ...
Page 48: ......
Page 68: ......
Page 81: ......
Page 100: ......
Page 116: ...trips automatic Reset Restart is not attempted and the Fire Mode Count is not increased ...
Page 118: ......
Page 130: ... Terminal connections for 3 wire operation 3 wire operation ...
Page 140: ... PID control block diagram ...
Page 165: ...Code and Features Description Code Description continuous rating ...
Page 170: ......
Page 186: ... Displayed as on the Keypad ...
Page 200: ...provided signal output at 150 36 sec ...
Page 216: ...Code and Features Description delay time delay time ...
Page 219: ......
Page 237: ......
Page 253: ......
Page 295: ......
Page 314: ......
Page 335: ...Manual Revision History Revision History No Date Edition Changes 1 2019 01 First Release ...