2.1 Mount on the Wall or within the Panel
Mount the inverter on a wall or inside a panel following the procedures provided below.
Before installation, ensure that there is sufficient space to meet the clearance
specifications, and that there are no obstacles impeding the cooling fan’s air flow.
Select a wall or panel suitable to support the installation. Refer to
on page
and check the inverter’s mounting bracket dimensions.
1
Use a level to draw a horizontal line on the mounting surface, and then carefully
mark the fixing points.
2
Drill the two upper mounting bolt holes, and then install the mounting bolts. Do not
fully tighten the bolts at this time. Fully tighten the mounting bolts after the inverter
has been mounted.
Summary of Contents for G100
Page 14: ......
Page 16: ...5 5 7 5 kW 3 Phase ...
Page 32: ...0 4 0 8 kW 1 5 2 2 kW 4 0 kW ...
Page 48: ......
Page 68: ......
Page 81: ......
Page 100: ......
Page 116: ...trips automatic Reset Restart is not attempted and the Fire Mode Count is not increased ...
Page 118: ......
Page 130: ... Terminal connections for 3 wire operation 3 wire operation ...
Page 140: ... PID control block diagram ...
Page 165: ...Code and Features Description Code Description continuous rating ...
Page 170: ......
Page 186: ... Displayed as on the Keypad ...
Page 200: ...provided signal output at 150 36 sec ...
Page 216: ...Code and Features Description delay time delay time ...
Page 219: ......
Page 237: ......
Page 253: ......
Page 295: ......
Page 314: ......
Page 335: ...Manual Revision History Revision History No Date Edition Changes 1 2019 01 First Release ...