![LSIS G100 Operation Manual Download Page 30](http://html.mh-extra.com/html/lsis/g100/g100_operation-manual_1944296030.webp)
Step2 Ground Connection
Remove the front cover(s) and the control terminal cover. Then follow the instructions
below to install the ground connection for the inverter.
1
Locate the ground terminal and connect an appropriately rated ground cable to
the terminals. Refer to
cable specification for your installation.
2
Connect the other ends of the ground cables to the supply earth (ground) terminal.
Note
•
200 V products require Class 3 grounding
. Resistance to ground must be < 100Ω.
•
400 V products require Special Class 3 grounding. Resistance to ground must be less
than
< 10 Ω.
Make sure to install ground connection between the equipment and the motor for safe
use. Otherwise it may cause an electrical shock and result in personal injury or even
death.
Summary of Contents for G100
Page 14: ......
Page 16: ...5 5 7 5 kW 3 Phase ...
Page 32: ...0 4 0 8 kW 1 5 2 2 kW 4 0 kW ...
Page 48: ......
Page 68: ......
Page 81: ......
Page 100: ......
Page 116: ...trips automatic Reset Restart is not attempted and the Fire Mode Count is not increased ...
Page 118: ......
Page 130: ... Terminal connections for 3 wire operation 3 wire operation ...
Page 140: ... PID control block diagram ...
Page 165: ...Code and Features Description Code Description continuous rating ...
Page 170: ......
Page 186: ... Displayed as on the Keypad ...
Page 200: ...provided signal output at 150 36 sec ...
Page 216: ...Code and Features Description delay time delay time ...
Page 219: ......
Page 237: ......
Page 253: ......
Page 295: ......
Page 314: ......
Page 335: ...Manual Revision History Revision History No Date Edition Changes 1 2019 01 First Release ...